When moving widgets around in a dashboard it is increadibly difficult to move the order and placement of widgets. While you can select multiple widgets to move them, you can't group them so that they move together when another widget is being moved near them.
Note that my item will not be resolved with creating a report with my project plans since I want to use the new Timeline view and the Timeline view is not available in reports and I also don't think that will solve my issue anyway. I am not the only one who would like to be able to link not only a start date but an end…
As an administrator of multiple solutions, it's difficult to trace the sheet and report dependencies when being asked to share an individual report or sheet. Typically, permissions are set at a workspace level anyway, to alleviate this issue. The workspace location information is included in the alert, so, if possible, the…
I would appreciate to see a detailed sheet with different properties than my main sheet and have access by clicking to a row. This row would be an Task Item and when I click on this row the pop up sheet will appear to show me the detailed status of the subtasks which are all listed in a different sheet with different…
I have Highlight Changes turned on with the selected timeframe however, with so many colors already existing on the sheet from conditional formatting, those that are highlighted changes barely stand out. An option to filter changes in specified time frame. Even better would be the ability to filter for changes made to…
The sheet activity log shows a row was deleted but it does not show the deleted data if it was deleted using an external application like Data Shuttle. This should be fixed.
When adding or editing a Dynamic Scope Report in Control Center, collapsing the list of pre-existing reports does not remain collapsed after the confirmation dialog box. Support tells me this is intentional, by design, and suggested I add a new product idea here. It would be great if collapsing these reports in Control…
Hi everyone When building a grid sheet can it be possible for Smartsheet to create a column with location then when peers do submissions that when peers press submit then the location can be automated into the sheet?
Introduce a seting that prevents dates on a graph from overlapping and becoming unreadable. It would allow the dates to scale to weeks or months depending on how long the time scale is.
Data Shuttle needs a unique ID when merging data. Sometimes there is not a single field in the data that we are trying to upload that is unique, but a combination of multiple fields can create a unique ID. There should be a way to CONCAT multiple text strings prior to the data being processed in Data Shuttle.
Hi Community, Welcome to the Product Feedback and Ideas space where you can help shape the future of Smartsheet! We really appreciate your feedback and will take all posts into consideration. Our product team will review top ideas and requests monthly and we'll share updates as soon as we get them. Remember: if you have a…
If a formula is longer than the 4,000 character limit it is simply truncated. Usually this results in an error message because the formula is no longer valid. However, if the formula ends with something that can be truncated without impacting the validity of the formula, it will work. For example, a formula ending…
We use Move and Copy Row automation in many of our processes. One 'unfortunate' component of a Copy\Move action is that the ENTIRE ROW-all columns of data- must be handled in one package. Wouldn't it be great, if I could tell the automation specific columns to move forward? Example: Copy\Move entire row out of sheet one,…
ISO 8601 ISO 8601 ISO 8601 ISO 8601