Add Finish-to-Finish dependency without compromising existing Start date of the successor
Scenario: I have Task#1 with a multi-day duration and a Start date that I want to preserve, but I want its end date to match the end date of Task#2. Adding a FF dependency to Task#1 (making it a successor) would be the easiest way to do this - and it does work as long as the end dates of both tasks are identical at the…
-
Increase Number of Groups (Reports)
Three is too few. We often need up to 10 groups.
-
Custom Date Range on PDF Export of Gantt View
Right now, when you enter a 'Custom Date Range' parameter on the export settings for a Gantt view, it will export the full months of the date range you have entered. For example, if you select the range of 5/16/2023-6/2/2023, the exported Gantt chart will show all of May and all of June instead of just the range selected.…
-
SHARE button links -- Automatically redirect for SSO Company Accounts
Please redesign the SHARE button. Every day, users are unfortunately presented with the same login page on initial load. “Welcome back to Smartsheet" "Sign in with your company account or Sign in with Microsoft” The SHARE link should be smarter than that and automatically redirect as necessary for SSO based company users…
-
Locked rows except for one cell/column
Have the possibility to have a cell/column that remains unlocked even when a row is locked. This would enable a free user to check that cell and launch an automation to request the row to be unlocked
-
More colors, at all costs.
Please give us the ability to call more colors even if we have to go grab hex codes from somewhere outside the smar system and manually type them into a box to display them. 40 colors, especially the ones that exist in smar, so remarkably limiting and make the sheets look horrendous. Not a good thing when you've got teams…
-
Ability to Reverse Populate a Form or "Slide" for Presentations
While using a form for data entry and collection, the same could be said for the reverse, being able to take data from a grid (either project plan, metrics sheet, etc.) and populate into a slide or sheet. For instance, I submit a form with information to be captured in a downstream grid, but can also generate a "slide" or…
-
Control Centre Automatic Move Automation Rerouting
I have a Control Centre Blueprint that contains two sheets, let's call them Sheet A and Sheet B. Sheet A has a Move Automation that sends the row to Sheet B. I would like it to be that when Control Centre provisions a new set of sheets, let's call them Sheet A' and Sheet B', the provisioned automation on Sheet A'…
-
Separate Access Sheet report between internal and external users
The sheet access report for us exceeds the 1,048,576 rows so we can't see a full report of sheet access. Perhaps one way to solve this is to create one report for external users and another report for internal users. OR come up with a text file export since excel has limits.
-
Send Update Request with Sheet Name