Dynamic View - View Only
Hi, I like the Dynamic View feature but can it also be set to view only? I want to use the Form feature and then redirect the submitter to Dynamic view to see their entry but do not want them to be able to edit it.
-
Assign Attachment to Different/Additional Row
(1) Sometimes an attachment is accidentally assigned to an incorrect row. It would be so nice to be able to move the attachment to the proper row without needing to (a) delete it from the incorrect row, then (b) upload to the correct row. Having a drag/drop function or "right-click, move to xyz" function would be…
-
iOS App, Requesting Support for Chinese Input Method in China Region
I am a user of Smartsheet in China, and I hope that this excellent project management product, Smartsheet, can consider the user experience of global users simultaneously. As a Chinese user, I encounter an issue with the Smartsheet iOS app. I am unable to use the Baidu input method, which is commonly used in China.…
-
Apply logic to document upload in Form
I would like a feature where the "logic" pathways can be applied to the Document Upload field in a form. For example, when you upload a document, the logic allows additional questions/texts to become visible. Essentially certain aspects of a Form would only become visible after a document is uploaded.
-
Global Update - Only for Projects Not Completed
Currently when running a global update it does the update for all projects that have been created. I would like to be able to select only projects that are not completed or canceled since updating all the projects causes the global update to take a long time and I don't need previous ones to be updated.
-
resizing/customizing the insight widgets
It really is a huge value to be able to take any one graphical display in work insight and pop it out to resize so you can see the full graph (eliminate need to scroll to look across the entire x axis) and maybe even the full length of variable/label names (if long). And also helpful to be able to edit the layout of the…
-
Multiple Links in Pie Charts
Hello, I have been asked by senior management at my organization if a pie chart in my dashboard can link to multiple pages (i.e. one page links to projects not started, another to projects in progress and finally to completed projects). From what I can see Smartsheet charts can only link to one item but it would be…
-
Restore Specific Cell Range
It would be helpful to be able to restore a specific cell range to a previous date. For example, if a team member incorrectly modifies an entire column in a report or clears the data in the column accidentally and saves, and no one notices or reports the problem until after a significant amount of other data has been…
-
API needed to see deleted/sheets/sights/reports for any specific user
Hi, This request is related with case#06467692. There is no api as of now that returns the details of deleted smart sheet objects hence API needed to see deleted/sheets/sights/reports for any specific user. please implement and let us know.
-
API Rate Limit Errors - For the large organizations there should be a way to increase API Rate limit
Hi, This request is related with case#6467720. API Rate Limit Errors - For the large organizations there should be a way to increase API Rate limit as we extensively use multiple Smart sheet APIs to prepare multiple reports and rate limit errors are common. Please let us know how it can be increased for specific set of…