Allow display of destination sheet full name in the Edit Automation dialog when moving copying rows
This is a simple request to allow visibility to see or display the full name of the destination sheet in an existing automation. Here is the use case: 1) I have created an automation whose action is to move or copy a row. 2) The name of a destination sheet that is selected is longer than what displays in the Editβ¦
-
Add multiple Bill Rate lines
By adding more than 1 bill rate line, Project Managers can compare billed rate versus cost rate for financial projections.
-
Automatically assigning a row to a parent line once an intake form is filled
I would love it if there was a way for a row that is entered from an intake form to automatically categorize to a parent line and have the option to place it at the top or bottom of the children. For example, if I have a ticket request form and on the sheet there are 3 parents, Pending, New, and Closed requests. Whenβ¦
-
Hide Widgets from Published Dashboard view
It would be helpful to have the ability to hide a widget from view on a dashboard when published or when viewing as not the owner/admin. For example I have a standard template for projects and a widget may not be relevant now, but I will want to use it in the future as the project matures. I would want to move it to theβ¦
-
Allow reviewer to download file - unchecked by default
Give sys admin ability to change default behavior in proof invite to not have "allow reviewer to download file" checked by default.
-
Add Proof Comments info type to Proof Info Column
We would like to use a workflow to notify users when comments are made to a proof. Thanks
-
Sheet Reference Manager panel - drag to expand the window
Currently the Sheet Reference Manager panelΒ is static. As a result I can not see the reference name in full. Due to cell reference limitation (100,000 cells), I sometimes have to remove references, but cannot see the full name so cannot see which ones to remove. Making the panel expandable, by dragging the bottom corner,β¦
-
More choice of colours for Projects in Resource Management
We have a number of projects running in Resource Management. We use projects to schedule not just billable project work, but a lot of internal projects tasks too (such as training, non-travel time, PTO/vacation). Currently it's only possible to differentiate projects by choosing project type, which gives you three options.β¦
-
Allow ISO 8601 Date format for dates (YYYY-MM-DD hh:mm:ss)
ISO 8601 is an international data standard and a part of two national standards in the United States. "The standard provides a well-defined, unambiguous method of representing calendar dates and times in worldwide communications, especially to avoid misinterpreting numeric dates and times when such data is transferredβ¦
-
Customize the one click down for Card View or Gantt View in Reports
When you double click into a card/ gantt line, would love the ability to only show a sub selection of whatever columns were picked in the report vs someone having access to all that's available from the original sheet. Currently when we create reports, we love the clean view of only a few data points in a card view orβ¦