Improve Activity Log to include API Detail
When Bridge queries a sheet, it will be indicated as such within the Activity Log. However, there is no transparency as to which API workflow this is coming from, so any kind of quick troubleshooting is impossible. Smartsheet technical support also is unable to see this information from their side. The Activity Log should…
-
Have a button to jump to the task bar in the GANTT-chart
I hope I do not mistaken, but what I miss in Smartsheet is a button where I can jump immediately to the task bar in the GANTT chart. I remember that such a button was in Microsoft Project 2000 ... 2010 available and it made life easier to deal with project plans. They call it there "Scroll to Task". Best regards Hans ...…
-
Allow to edit Jira Project after a Jira Connector is set up
It would be great to be able to update the "settings" tab within a Jira connector, especially to be able to edit the "Jira Project" field to add or remove projects.
-
Maintaining Summary Sheet History
I use the summary sheet extensively for allowing project managers to provide high level summary reports on their projects. My c-suit would like to be able to see status report history. In absence of printing out PDFs each reporting cycle it would be great if Smartsheet could maintain an audit trail around changes to…
-
Form Validation for Negative / Positive Number
The form validation for "Number" should be enhanced to either allow a positive and/or negative number. We leverage number validation for submitters to enter quantities. This number would never be a negative number, and from a data integrity perspective we cannot simply assume the user intended the positive inverse. It's…
-
Send Automatic/manual update link of a row
Currently there is only manual update request to a row. And the link will be a one time use only. It would be good if the link is permanent and can send the link so that team can update on demand
-
Standard folder location when adding source data
Hi, Another 2 cents from me; When for example adding a Dashboard in a Folder I am working in, and after that adding a Widget in that said Dash (like a Chart); When clicking Add Data the standardfolder is top domain. It would be nice that the folder is actually the one I am working in in stead of having to open the folder…
-
Hide field in Dynamic View Details Pane in not New
It should be possible to control if a field is hidden or not depending if the is a new row being added or an existing. I have fields that need to appear if this is a new row being added, but not if this is an existing row.
-
Folders within a workspace should sync just like the workspace itself when creating a report.
I recently discovered that a folder within a workspace (which has the look and feel of a folder) does not function in the same way as the workspace itself. When creating a report I may want to focus on a subset of items in a folder and ensure that it syncs anything within that folder. In my case, my workspace contains…
-
Summary Sheet Modified Time
I use summary sheets to capture high level project status information. I understand i can use the [Modified] formula to capture when any of the individual smart sheet rows were last modified. I would like a formula that captures when the summary sheet fields where last updated.