-
click links in card "edit" view
I often put URLs in task descriptions on my to-do list, usually referencing an email or something, and I have my card view set to show the description. If the description is short enough that the URL is shown in the card view, I can click it. But if the description is so long that only the first part shows and the URL is…
-
extend the timeout period for calculating formulas/saving sheets and reports
Currently, when a sheet / report has lot of formulas (but under the max limits quoted), it will take time to save the file. There is a timeout set in the system that the save will fail if the timer expires. Advised by support team, need a feature request to extend the timeout. Workaround now is to reduce the number of…
-
Printing embedded sheet within dashboard minimised
When embedding a sheet within a dashboard, this appears normal and stretched across the page. However, when printing the dashboard which we do from time to time to include in board papers, the embedded item becomes minimised. Currently there is no work around other than printing it as an individual sheet and having it as…
-
Cell linking and the addition of new rows in master
Please configure cell linking to reflect the addition of rows in the master to the linked sheet. We are constantly adding new rows of data to our sheets and would love if those were reflected in the subsequent sheets. Hard to believe this is not already implemented into your system...
-
Editable Date and Contact Fields in Outlook Add-In
Presently the Outlook add-in for Smartsheet does not allow you to edit date or contact fields. I feel like it would be beneficial for those that track tasks in Smartsheet (from email requests) to assign due dates and email addresses in contact fields. We currently use a department smartsheet and a contact column to tell…
-
Resetting Auto-numbering for columns in templates and sheets
Problem: When creating a template from another sheet with an column set to type auto-number, I have learned through technical support that you only have ONE chance to reset that column back to start number 1, and only by deleting the old column and creating a new one. If you make a mistake with the numbering schema, you…
-
Budget and prognosis synchronisation between Resource Management and SmartSheet
As it is now, only very few data fields can be synchronised between a project in Resource Management (RM) and SmartSheet (SS). There is currently no way to automatically synchronise any overall project information (budget, incurred, prognosis, total budget, expenses) from RM to SS. Our team uses RM for all our specific…
-
Custom auto-save times in profile
Besides the set options a custom setting would be beneficial .
-
Weekend Indicator
I would like for smartsheet to provide the capability to leave Saturday and Sunday greyed out even though it is selected to be a working day. It helps break up the background and still provide the user with a quick reference as to how many weekends are being used.
-
URL-Query on Dashboards
It would be extremely useful if there was a way to update a form by referencing it in the URL of the dashboard. For instance, referencing the form ID in the dashboard URL, and then referencing the columns in the form as done normally with URL-Query We have redundant tasks which have several columns in the form that need to…