Hi We capture a lot of photos on site and upload them into our grid sheets to record our projects. In our project meetings it would be good if we could click on the photo within a cell and open up the image to discuss in more detail. Kind Regards
-
Automation of links to added line
Currently, cell linking is done manually, and there's no automated method available. My idea is to create a feature or an automated workflow that allows adding new rows below while inheriting the cell links used in the rows above. I believe this is an essential feature for achieving more efficient management moving forward.
-
Resizable columns in Dynamic View home page
In Dynamic view home page, the fields cannot be resized at present. It is required to resize the columns so that the complete DV name can be seen, because the visible portion of some views can be same but the later part can be different.
-
Provide ability to set column freeze via API or control center
We have a template/ toolkit that we update via control center. Over time we have added, removed and moved numerous columns in a manner that now the order of the existing sheets are very disordered. We've have played around with reorganizing the sheets using the API based on column index - while this works it moves the…
-
Additional formatting options in control center (numerical)
We've recently added a currency column to our toolkit template via control center but the currency format that exists in the template was not applied to the existing projects on global update/ addition of the column. We would like to ability to apply these sorts of numerical formatting changes ($, %, etc) via global update.
-
Timesheet approval on mobile
Our managers would like to approve Resource Manager timesheets on their mobile devices. Currently, we can submit time but not approve time.
-
Dashboard Usage Metrics
I wish there were a widget that I could include on each dashboard that accounted for dashboard usage. Something like the # of visits and # of unique viewers over the last 30 / 90 / 365 days.
-
Resource Management: Collect Task "Start/End Dates" and Task "Status" Type
I don't see a way to add tags to collect a row/tasks Start Date or End Date, so it can be reported against in the Resource Management Report. Also, my team would like to be able to set a custom date range for the report but have it remain. Such as "Last 7 Days / Next 7 Days" and keep it in place as an option to select.…
-
Document Builder: Make hyperlinks clickable
When generating a document using Document Builder and a field contains a hyperlink entry (from a column at the sheet it's generated from) the hyperlink is not clickable in the generated PDF doc. Is there a way to make it clickable?
-
Way to calculate parent row % Complete in other columns (like % Complete) for SPI.
We have a Planned Value column that is based on Start and End dates and a SPI column that is based on Planned Value and % Complete. Our Planned Value column is used to show what the task % Complete SHOULD be for the project where the % Complete is what the ACTUAL % Complete for the project is. The SPI uses %…