RockyJim’s Profile

Community member since July 2018

points
15

4

Building a kanban board with typical IT cycle states: Ready, Dev, Test, Deploy, Done.  I'd like to track cycle times and throughput.  I've created (locked) columns to capture a status change for each of the cycle states; e.g. Dev Start and formula "=IF(Status@row = "Dev", TODAY())". That works to