PowerBI Connector and Reports - Visuals Stop Working after Gateway-side Refresh of Data
Context: I worked on a dashboard that's pulling dozens of sheets and merging them together into a dataset. It's time-consuming to add each Sheet to PowerBI and requires many manual steps. I've explored using a Report as it can automatically pickup new sheets automatically, adds the sheet name, etc. When I import into…
-
AI for Reports
Will this feature be added to reports? Will CoPilot be integrated into the AI options?
-
Tired of messy image attachments in Smartsheet?
Tired of messy image attachments in Smartsheet? I built a small tool that lets you upload images directly into **cells (not as row attachments)** — making sheets much more structured and easier to review. 🔹 Before: Multiple attachments per row → hard to track 🔹 After: Images mapped to specific columns (clean & organized)…
-
Duplicating a Report Sheet in Smartsheet
Hello. I have a report, and I want to use the same settings / filters on the report page but for different projects, so I "saved as new" and renamed it at the top, BUT, how do I clear it out so there's no existing information entered that's on the original report? ( I hope that made sense ) - any help or suggestions are…
-
Report for due dates
Hello! Does anyone know if there's a way to create a report for specific projects that reflect tasks that would be due on the same date? For instance, if several projects have the same due date, it will show up as such on the report so the manager would see this and due dates would not be overlooked. Any assistance is…
-
Audit-centric tracking report
I am trying to figure out the best way to create a sheet for tracking all programming changes made for our development team. We have several different features that can be updated at different time, and i need to be able to track the latest version, who approved the release, and the release date. Ideally an audit report…
-
Scheduled Report Email Not Sending – Next Send Date Reverts to Never
I am experiencing an issue with a scheduled report email that is not sending. I have exhausted all troubleshooting steps on my end and need some insight if someone has experienced it before. I have set up a scheduled email via File → Send as Attachment with a weekly recurrence. After saving the schedule, the 'Next sent…
-
Legacy Dropdown Functionality Option
Good afternoon, Recently there was a change that made searching a dropdown by typing inside of it switch from an exact match method where typing S would only show entries that begin with S to a search within method where typing S would show all results with the letter S in them. I can see how this would be beneficial in…
-
Start Date Formulas not appearing in reports
Hi community - ran into an issue I've never experienced before. Across all my clients, we use formulas to project dates (we've used durations/predecessors in the past, but it's not our preferred method). If we look specifically at the "TEST - SD - Internal Scope Alignment Call" line, you can see the "Start Date" formula,…