Count Rows Where A Value in Multiple Columns is blank
Is it possible to count how many lines meet certain criteria AND have a blank value in Column 1 OR Column 2 OR Column 3? For example I have a Smartsheet with a questionnaire and am currently trying to calculate metrics from the answers in said questionnaire. One of my metrics is "Level 1 Completion" (which is equal to "Q1…
-
Dashboard and sheet chart graphics for ADA / color blind
I would like to have options other than color for reports/graphs that show texture on charts instead of color. This would help those who are color-blind read the data in a better format.
-
Dashboard Gantt Chart - Visualizing Variances
Hi ! My Dashboards are meant to visualize high level information on my portfolio of projects. One key is visualizing the project duration on a Gantt Chart from Inception to Completion (Project Start to Project Finish Date), which shows as a single bar connecting the two dates. However, the Gantt Chart in the dashboard is…
-
Merged: Emailing Dashboards as pdf.
This discussion has been merged.
-
Dashboard Widgets | Shortcut Widget Side by Side is not Side by side...
The Shortcut Widget layout says side by side but it still looks like stacked on top of each other (or am I missing something here?). How do I do Side by Side using the shortcut widget?
-
Cell Value Capture for Monthly Reporting
Hello, I am trying to build an executive summary dashboard and would like to capture cell values at the beginning of every month to compile on a monthly basis. I have thought about using a row copy automation however i need to build a "capture sheet" for the dashboard to reference for several data points (total invoice…
-
Creating a count for a Column
So I have a column I am trying to get a count of by year for a Metric dashboard. I am using the following formula: =countif([Completion Date]:[Completion Date], ="2023"). This formula is not working and I am not the best with them. Can someone help me figure this our?
-
Select the time period in a published calendar view of a report
I would like to be able to set the time period shown in a published calendar view of a report. At present, it defaults to one month, and can be changed in the dashboard, but at that level, many details contained in each day's content is lost, and viewers may not know how to change their view. Thanks.
-
Count If Site matches Question
Hello, I am trying to pull a count of a column "Food Safety Hold" if the "site" matches. I am trying this but it is not working. =COUNTIF(MATCH({Site}, Site@row, {Food Safety Hold}, 0)) =COUNTIF({Food Safety Hold}, Site@row, {Site})
-
Count if date is in the past
Hi All, I am looking for a solution to a problem, I am trying to pull together a chart for a dashboard, displaying the number of overdue documents under review we have - the sheet is set up as below, and I have set up a 'metric sheet' however I am not sure this is the best solution. I have been using this =COUNTIFS({Master…