How do you extract numbers out of a cell and create a chart with the data
How do you extract numbers out of a cell that is formatted in a 12-hour clock and paste the numbers into another cell? I need the column "Time Duration" to know the difference between the "Start Time" and "End Time" and then on possible another sheet show a chart of over a period of time. I was even thinking, I could…
-
Capturing a Total Count to display in a Dashboard
I am trying to capture the total number of active projects found in a specific Workspace. Each project is its own, separate, SmartSheet. The way I am able to do this now is by manually creating a Formula (COUNTIF({Proj Name Range 1}, "Yes"),in a separate SmartSheet, and then creating a Metric Widget within the Dashboard to…
-
Backup tool for one user only?
I am using the backup tool provided through the below link with SmartSheet. The issue we are running into is that we do not need it to backup every single user (this is time consuming and bloats to over 3 gigs of data currently). We are looking to keep this more targeted if at all possible. Has anyone had any luck altering…
-
Counting physical inventory while removing duplication...
I'm trying to count the number of unique pieces of equipment that are on my worksite. Each unit has a specific Unit Number listed in a sheet. Units that are On-Site are indicated by a green dot in another column. The tricky part for me is, some of these Unit Numbers have multiple work orders which are listed on another…
-
At Risk Flag Formula issues/questions
I searched through the Community and found a couple of formulae that either directly addressed what I want to accomplish or I thought could be modifed to do what I want. I get the #UNPARSEABLE error for each of them. I'm sure I'm missing something basic (new user) since all of the responses to the solutions are positive. I…
-
Formula to check a box when date entered + 2 days
Does anyone know if it is possibly to set a box to check a certain amount of time after a date is imputed into a row. For instance, we need a lag time on a project complete date of 48 hours. This is for a manufacturer that needs 48 hours for stain, etc to cure before project is technically complete. This is the formula…
-
Legal projects/task management sheet
Hi, I’m part of an in-house legal department. The company has different departments and different types of contracts/advice they require us to produce. To track the work, I have created one sheet for the legal team to use, covering all main "legal work" categories and then broken down to sub categories, tasks and then sub…
-
Countifs project status is neither complete nor cancelled
I'm new to this, and I'm having issues with counting the number of projects where Project Type = X and Project Status does Not equal Complete or Cancelled. I'm fumbling my way through unsuccessfully. This will go on a dashboard where I have other working formulas, but this is out of my expertise. Here's what I have so far.…
-
Add RTF (rich text formatting) to Comments
When creating a project many times the comments are as much instructions, as comments. Just like this modal when creating community comments, add the ability to apply Rich Text Formatting; Bold,underline,bullets, and numbered lists. RTF functionality would be limited to manually entered items, not pasted items. The…
-
Trying to count multiple people in a cell
I have a column set as Contact List and the Allow Multiple Contacts per Cell field is checked. I am using COUNTIF statements to count how many people are assigned to the tasks for a dashboard. I am using the formula: =COUNTIF({Project List Range 3}, Assigned1) Where Project List Range 3 is the Column in my master sheet…