-
Blueprint Activity Log
Blueprints in Control Center programs should have activity logs to show what changes have been made, who made them, & when. This is especially important when there are multiple additional leads. All leads should be able to access this activity log to see the history of blueprint changes.
-
While using blueprint, not able to retrieve the project name
Seeing this "[blank naming tags]" in the Project Name field in control center homepage even though a name is provided in the intake sheet.
-
Do Blueprint Activity Logs Exist?
Is there such a thing as a Blueprint Activity Log or some other way to see when/what changes have been made to Blueprints? Our Blueprints have had MAJOR changes made but we cannot determine who made them/when & we would really like to track this down as well as what changes were made so they can be reversed/repaired.
-
Modify Blueprint takes forever and then doesn't complete
I have had a working blueprint for close to a year with minor adjustments to the blueprint, but all has been going quite well. I recently made some more adds and modifications - saved the blueprint and this message goes on for more than 45 minutes. It has never taken that long. When the save did finish it seems like it…
-
Remove "Toolkit" name from project name
When our projects provision, it includes the name of the "toolkit" in the name. While it's at the end, it truncates the name of our project to include "-toolkit name." Is it possible to automagically remove this portion when the project provisions?
-
Remove Limitation using Dynamic Reports in Blueprints
After about a year of trying to understand, we finally figured out that when using Dynamic Reports, ALL manually added source (sheets) were removed. We use a report for scheduling from all our different "projects". Because of the cost of blueprints, we only used them on "project types" that need to be exactly the same…
-
Issues Connecting Dates in Blueprint derived Workspace and Summary Sheet
I'm having some difficulty in associating a date cell created by a blueprint program with the project it creates. Is there a way to change this that I'm unaware of? Setup Summary: I have a blueprint that pulls from an intake sheet to create a new project workspace. The intake sheet contains a Start Date and a Go Live date.…
-
Multi-Tier Blueprints
How do you enable multi-tier blueprints in control center? Do you have to create a new program first with it enabled, or can you enable the multi-tiered option on existing programs? Thanks,
-
Control Center: Blueprint Creation - Smartsheet summary
When creating a new multi-tier blueprint and selecting "linked to a parent project" on the 'Blueprint Basics' screen, after I get through answering all of the other questions and get to the 'Blueprint summary' screen, I don't see my Rollup/Summary sheet as an option on the "Blueprint Summary Sheet" drop down. The…
-
What is the Required checkbox on the Customize Profile Data page of Control Center for?
I'm curious what the Required checkbox on the Customize Profile Data blueprint setup page of Control Center for? Does it control anything specific? Never been entirely sure so I figured I'd ask to see if anyone can explain it. Thank you!