-
Timeline Reports - Removing Uncategorized Group
How can you get rid of the uncategorized land in a report timeline view?
-
How to include alpha information in a summarized report
Hello, I have a report that summarizes all hours spent on a particular phase. Is there any way to include the missing information? I need to create a condensed report to add to a dashboard. Missing information: Site Name, Turbine Number, Blade Number, Date Performed, & Current Phase
-
Merged: Reports Showing Collapsible Indents
This discussion has been merged.
-
Issue sorting Dates within a Row Report
I am trying to sort dates within a Row Report and I keep getting results that are not in order. The Column type is a dropdown, and from what i have researched I understand the sort is dictated by the order of the dropdown. The dropdown is already in order by date in my source sheet. I have even created a separate column…
-
Sheet Access Report - Errors due to Commas and Quotes in Sheet Name
Sheet access report - currently generating errors due to sheet names that contain quotes in the name (e.g., "Client Name" text text text) Prior to recent changes in the report, these were not a problem. We cannot control what characters people put in sheet names. Some also have commas in the sheet name. I've been running…
-
Recover file
Hi, I want to revover an file that i delete by mistake. How can I recover it?
-
Best way to visually separate different phases in a Smartsheet tracker?
Hi, I often build trackers for workstreams that move through a process or lifecycle. Where these involve distinct phases, I’d like a clearer way to visually separate each phase within the sheet. At the moment, I’m just using coloured columns/lines as section breaks, but it doesn’t feel particularly clean or optimised. Does…
-
Template form link and Roll Up sheets
Has anyone done this? Can you add a form link (status update form) to a roll up sheet automatically once the project is provisioned in Control Center. Essentially the end goal is that already created template form, I would like the link to auto populate the form link from the status update sheet after provisioning so users…
-
Font size
It would be helpful to have the ability to change the font or increase font size in my report and on my forms.
-
Report adding and removing sheets
I have a report that consists of 27 sheets. Shared sheets and report with 3 people. These 3 people do not have the ability to add or remove sheets in this report. Is that normal? I would like for them to remove sheets as they complete a project. Attaching an image - the selection option is grayed out for them.