Hi!
I have my reference sheet (Quick Issues Form) where Issues are submitted as they happen during a shift, and they have a date, description, and delay time. There might be 3 different submissions for 3 different Issues that occurred on the same date. I have my destination sheet (Shift Notes Form), where an entry is submitted at the end of the shift as a summary. I have columns named "Issues Descriptions" and "Total Delay Time", where, as of right now, staff have had to manually copy/paste what was submitted in the different entries for that day in the Quick Issues. I want to create a formula for the "Issues Descriptions" that goes into the reference sheet (Quick Issues), checks the entries submitted on the matching date as in the entry of the destination sheet, and compiles all of the descriptions. Same as for the Total Delay Time, I want a formula that goes into the reference sheet, checks the entries submitted on the matching date as in the entry of the destination sheet, and sums all the entered delay times.
(Here attached is an example of issues submitted on the reference sheet for the date 12/13/2024)
Thank you in advance!