What are the plan options for Sights? Is it a case by case basis? There does not look to be any standardized planned options.
I want to have pdf files on my site and an easy way to update them. I tried loading them in google drive but when I update the file in drive the link on my sight is still the original pdf. sometimes we update a pdf several times a day, what is the best way to do this?
Only a couple of days into the trial and I was looking at creating some KPI's for a Sight. Based on what I'm seeing, the underlying calculation MUST exist on a sheet somewhere to be pulled into a sight. The problem I run into is if on a sheet a column is a date or drop down etc. and I want to use a cell in that column in a…
Thank you for yesterday's update allowing images to link to sights via Metrics and Sheet Data widgets. My staff and clients will appreciate it. Now it's time for me to build more Sights. I am able to import an image from another BI Dasboard software to a cell and present it on our current and future sights.
Hi there I’m currently running an exercise where we are asking a group of 30 users 10 sets of questions each. Each set of questions has its own web form so there should be 10 responses from each user (300 separate rows in total). I have this working fine. The users have requested a ‘dashboard’ which would allow them to see…
We have several large projects that require their own sheets. However, we also have many small projects that do not justify creating separate sheets. They are quick one or two day jobs, but they affect scheduling and P&L need to be factored into that. Does anyone out there use one sheet for multiple small projects? And if…
When you open a Sight, the widgets are drawn/updated in the order in which they were created/added to the Sight. For larger Sights where widgets were added later to the top of the Sight, the "older" widgets at the bottom are drawn/updated first. Is it possible in a future update to change this so that the widgets are…
Hi I noticed that the above widget says that I can copy a range of cells but I haven't figured out how to select multiple cells in a row (not next to each other) and also how to put multiple rows (not next to each other). Is this possible?
Is there a way to select from a project schedule the next upcoming milestone. I have a flag column identifyng milestones and a column that calculates for just milestones the number of days between the task finish date and today's date and therfore the lowest value is the next upcoming milesone. I desire to pull the…
Hi, Is there way we can use Reports within a the Metric Widget in Sights? I have a set up where I am trying to display "Counselor of the Day" in this widget, but my only option is to use the sheet as a source. When I do this, the link to the source cell is static and It only points to the cell that was initially selected.…