Hi, I have a series of report links on a dashboard. Both the dashboard and the reports have the published option selected (available to anyone with a link). Non licensed users are able to access the dashboard with the link provided but are then being prompted to log in to their smartsheet account (which they do not have)…
I have published a Dashboard to non Smartsheet users, that contains a number of reports added as separate widgets. When I click on these widgets as a Smartsheet admin (and creator of the report) I get into each report. I published each report also. The source data of the reports is not published though. When I give the…
The function - Export to MS Project (XML) - is no longer working Has it been taken out of my subscription and have to upgrade or someting?
Previous embed the smartsheet in the wiki by iFrame, which is published link , it doesn't require log in. But now it required log in, it is really annoy. Any way back to original way?
Hi Smartsheet Community, I'm authoring a production schedule and one of the columns automatically populates status (complete, in progress, not started) based on a formula. For a specific row, I need it to display "In Progress" if the start date is within the next 5 days. Is this the correct formula for this? =IF([Start…
I'd like to display a view of some of my sheets within an SAP JAM group though the setup in SAP JAM requires the Smartsheet website to begin with "https://app.smartsheet.com/b/publish". Does this require publishing the page so that it is visible to users without a login or is there a workaround that anyone is aware of?
I have a card view that is set to display with a filter on by default. Is it possible to also Publish this to the Web with a filter on by default?
When I view the activity log for my dashboard which has be published read only I see that the "publish user" has disabled publishing. I didn't think this was possible. Does anyone know how that would happen? Terry
I'd like to show a sheet in the dashboard in both: 1. Grid view 2. Calendar view WHen I publish the link to put on the dashboard, it only one or the other. Please tell me there's a way to publish in multiple formats!
Project Sheet 1 and Project Sheet 2 have detailed data. Sheet_report_summary pulls the "Sheet Summary" data (icon in the right pane) for executive summary. In our engineering meetings, we drill down into the details of each sheet. Can I show the "sheet summary" data on the sheet itself? For example, a project is RED-…