Introduction post
hi all, my name is Vesna and I work as a senior project manager in regulatory affairs for medicines
-
Looking for Inspiration: Attendance reporting/matching
Hello Community, I am not sure where to start with this project: I have a class attendance sheet that I'd like to build further and I'm not sure where to go with it. Here are the parameters: I have several groups of participants (cast members for various entertainment productions). Each group has different numbers, as they…
-
Looking for assistance with a formula
Hi all, I am new to formulas and functions in Smartsheet and have a large sheet that I would like to summarize using an "average" formula/function. I need to include at least 2 separate criteria to filter correctly and I am having trouble combining the avg and collect functions as suggested in the functions list. I have…
-
Editable Sheet Summary Report
It would be a good addition to Smartsheet to be able to edit data in Sheet Summary reports, just like we can edit regular Row Reports. I don't understand why the 'two-way' data entry functionality between Sheets and Reports does not apply to Sheet Summary fields.
-
#BLOCKED / Auto-Save Issue in Project Billing Forecast Report
We are still facing a critical #BLOCKED / Invalid Value issue in our Project Billing Forecast Report. 📌 Current behavior: In the underlying Sheets, formulas (e.g., Total Billed This Period, To Date Billed) initially show #BLOCKED/Invalid Value, then refresh to correct numbers. However, the Sheet does not auto-save this…
-
Report not pulling from one of the selected pages
I have created a report for my boss called the "latest comment report". It pulls the latest comments within the last two weeks from all my active project sheets. It is working great for the most part, however the report is not pulling the latest comments from one of our project sheets. All active project sheets have a…
-
Status Log Push to Dashboard
I want to push the latest status log sheet entry to the dashboard. I have added working columns for the last date, recent value (0 or 1) and recent status (text field). The recent columns are blank except for the most recent data rows (that part of the sheet is working). I have a project metric sheet template across topics…
-
How to Create Time Duration
I have a report where I need a formula to figure out time duration. For example, employee starts at 8:00 am and ends at 9:00 am, I need the next column to tell me 1.00 to indicate he worked 1 hour. I will be using military time throughout this sheet.
-
Create a Report Widget with an option to Export not Web Content
This is a REPORT WIDGET screenshot. This loads instantly when I open the dashboard even with many data entered (screenshot doesnt have any right now). It does not have an option to copy text or export the file. This is a WEB CONTENT WIDGET, using the REPORT Publish link, I was able to display it. It has the option to copy…
-
Will and API token for a report give access to the Sheet the Report generated from?
Hi, I have a large Smartsheet, I want to generate a row report that reduces information displayed down to a specific group. For that Row Report, if I were to generate an API token and share it to a third party, will that third part have access to the information on the original 'Grid' sheet, or will it be reduced to what…