Calculating if one date is 14 days greater than another date
Hello, I need to calculate a flag if the construction end date (in a cell) is greater than 14 days from the construction start date (in a cell). If the result is greater than 14 days the row will be flagged. I don't even know how to start. Any help would be appreciated.
-
Nested formulas - conditional text concatenation
I want to set up a column in which all components of a name are concatenated. However, I don't want to include the "middle initial" field if it's blank. I've achieved this in Excel, but can't seem to find the right method in Smartsheet. A screenshot of my method in Excel: In Smartsheet I've tried a number of variations,…
-
How do I populate a list of values from one column if a checkbox is selected in another column.
Ideally, I would like to populate all of the values in column 2 into one cell if the checkbox is selected in column 1. I would like each title to be on it's own line in the cell. For instance, The cell should look like this: Adjusting to Remote Work Life Admissions Processing & Review Advanced Capture (AnyDoc):…
-
Is there a way that I can have a form populate two different rows in my sheet?
I have a sheet that I am using to track some events that I am running and I have created a form to allow people to request support for additional events. Sometimes these people will have two different events that they will need help with and instead of making them fill out multiple forms can just one form populate multiple…
-
If parent card is dragged to later row in roadmap, then children cell value changes.
Hi All. This is very similar to the thread that @Paul Newcome answered on children rows populating / changing a parent row here: https://community.smartsheet.com/discussion/13326/formula-to-update-status-on-a-parent-row-based-on-any-child-row However, my situation is opposite. My ask: if I drag a parent card to a further…
-
Formulas Including Today as Calculation with Blank Values
Hello. I'm trying to use the Today function to help calculate a check column. Essentially, I want to compare a Due Date Column and a Completed Date column to return a value in the Two Weeks column. If Due Date is within the next two weeks of Today AND the Completed column is blank, it should return a value of "1" in the…
-
Formula needed: Multi drop down select column to output value in another column
Hi All, Any help with a formula? This is driving me nuts! Basically what we're hoping is to be able to select multiple values within the "Rate_Card_Tactic_T4/T5 column", and output the dollar amount that is assigned to that tactic in "T4/T5 Cost - Email Blast" column. This is as far as I've gotten... it works only if I…
-
COUNTIF FORMULA (3 Columns, 1 Column includes contact)
Hi All, Need help with a formula! I need a formula to summarize the following criteria. If Project Track = XX, and if Project Phase = XX and if Project Manager = X Person" what is the output? My current formula, but it doesn't seem to be working. Is it due to the fact that the Project Manager filed is set to contact list?…
-
Formula to update a value automatically
I have 5 rows. The value for each can be low, medium, or high. If the majority of the rows is one of the values then I want row 6 to return that value. But if any of the rows are high Row 6 value should be high. Example: Row1--Medium, Row2--High, Row3--Medium, Row4--Low, Row5--Low., Since Row2 is High Row 6 value is High…
-
NETDAYS #INVALID DATE TYPE
I am trying to get days between 2 dates with the following formula. =NETDAYS([End date]3, [CR1 - Fabric yardage]3) One of the dates came from another sheet, with formula. If I type a date on top, the formula works fine. How could I fix it? Thanks!!