I have a sheet where one of the columns has a link for each row (project) to a detailed project sheet. When I run a report and include the column with the links in the report, the links are not clickable from the report, so users can't get to the other sheets. Is this as designed or is there something wrong with the reporting feature? It would make sense if the link didn't work if the user didn't have permission to that sheet, but it isn't clear why the links don't work at all. The links work fine from the sheet that the report is built from.