I suggest creating a network diagram view to visually see critical chain tasks.
-
Updating the formatting of help text in Dynamic views
Ability to format help text in Dynamic view, including text colors, formatting, links adding headers/dividers/sections.
-
Smartsheet Dashboard with Dropdown list to select desired projects will save time
If the dropdown list is introduced to Smartsheet dashboard to select to desired projects to show in a dashboard will save the time for creating dashboard for multiple projects. So one dashboard can be used for Multiple projects by simply selecting desired projects using Dropdown list option.
-
Merged: Tabs
This discussion has been merged.
-
GANTT - Set Manual Start Date + Define Predecessors (for the same task)
// Current situation Currently, adding (1) manually a start date for a specific task AND (2) defining certain predecessors for the same task is not possible // Problem Description Let's imagine, we have the following two tasks to plan: Task 1: Starting at day 1 and a duration of 10 day Task 2: Starting at day 15 and a…
-
Option within "Save As New" to create a new version without comments or attachments
In the Save As New functionality, create an option to remove comments and attachments from all sheets within the new version.
-
Formulas used in worksheets
Before I create a sheet, is there a way to have SS automatically log and track when I use a formula? I am guessing @Paul Newcome and @Genevieve P. have helped me dozens of times. So I don't have to keep going back to them, I am going to try to create a sheet that displays the FORMULA, lists the sheet it is located in maybe…
-
Chart Dashboard Widget using Sheet Summary data fields
It would be great to be able to use the chart widget with data held at Sheet Summary level. Appreciate that there are 2 ways around this : Create a report and chart against that Add "helper columns" to the sheet itself However, I'd prefer to reduce the number of new reports I'm creating, and keep sheet complexity lower…
-
DocuSign Naming Feature
To be able to have the Project Name be the envelope name and generate fully from Smartsheet. Right now, the draft in DocuSign is the only applicable way to really use it for a large company. So my accounting director doesn't have all the unnamed documents coming to her in addition to all other departments sending her…
-
Sheet Reference Manager panel - drag to expand the window
Currently the Sheet Reference Manager panel is static. As a result I can not see the reference name in full. Due to cell reference limitation (100,000 cells), I sometimes have to remove references, but cannot see the full name so cannot see which ones to remove. Making the panel expandable, by dragging the bottom corner,…