Lag in Dependencies AND elapsed days in the Duration
There has been a recent change within the last month or so that caused rows that were using lag in the dependency AND elapsed days in the duration column (which is an INCREDIBLY common occurrence in our project plans). This recent change has now messed with all dates both past and future that are either directly orβ¦
-
Adjust Column Size in Metric Widget
Please give us the ability to change the column size within metric widgets. It is very difficult to get good spacing with a forced 50/50 column size. Couple examples here: If I could adjust the right-side column size, I could have a perfect metric widget. Please Please π
-
adjusting the way baseline columns generate
Hi, I would like to make it so if I turn on baselines, I can use currently existing columns for dates and variance, rather then having to generate new ones. The reason for this is so I can use those columns in pre-made reports that are consistent across all projects built from a template, rather than having to manuallyβ¦
-
Filter feature on sheets
A filter logic. This could allow for a filter with multiple AND OR conditions.
-
Reports to include Parent Rows
I figured a way to do this with a helper column but it is a tedious work around. I have to send out regular reports that require me to adjust the filter in a report every time.
-
Grant Tracking and Grant Management Templates
Please consider making actual Smartsheet templates for the grant management templates mentioned in this promotional content: https://www.smartsheet.com/content/grant-tracking-templates?srsltid=AfmBOoq237APmFKBrkYupYpdqz0AnefE8DCyT0dfsSPZcKhBTvaEm-By
-
Merged: Reports - filter with parent rows
This discussion has been merged.
-
Merged: Schedule Baseline updates
This discussion has been merged.
-
Merged: Sheet Filters in Filter Groups
This discussion has been merged.
-
Merged: Reports - Print PDF with Groups
This discussion has been merged.