Report link in Intake sheet
Hi all, I have created a configuration in the control center, where I will roll out a sheet and a report together. In the intake sheet, the sheet link is updated once it is rolled out. Can I get the report link too? It's a summary report of the sheet and I want to share the link automatically with some team members. The…
-
How to ensure Dashboard links remain dynamic in Control Center
My blueprint contains a dashboard that has several links to other reports/sheets within the same workspace of that blueprint. In the summary/meta data sheet, I would like to ensure that when I am referencing links to reports/sheets within the same workspace, control center will know replicate that logic in new workspaces…
-
Can I move the location of the intake sheet (control center)
Is it possible to move the sheet without causing any issues? Will control center no longer be able to link up any information or will it need to be set up again?
-
Control Center Blueprint Not Appearing
I have two blueprints in Control Center and when I go to create a project, neither appear as an option. I've tried creating a duplicate of an existing blueprint but still am not presented with any option to select a project when creating a new project from CC. I tried checking an existing blueprint settings and when I get…
-
Multi-tier reporting in Control Center?
I am looking for a way to set up a report in my parent blueprint so that: Every time a new child project is provisioned, a specific sheet from that project is added to the report at the parent level. The parent report is a collection of that sheet in all child projects. Things I tried that didn't work: -Adding the child…
-
Add New Template Sheets to Existing Project Workspaces In Bulk Via Control Center
Currently you need to manually add a new "optional" template to each project one by one. This is incredibly time consuming. We need a global update option to add a new template sheet to all existing projects automatically.
-
Why is blueprint project creation failing to update reporting
I've recently had an issue with summary reporting failing when creating new projects through a blueprint in Control Center. When I run the blueprint to create a new project I get an error at the end that says "Summary Reporting: failed to update cell links to summary report" (first image below). Then, if I select Update…
-
Automating blueprint to create templates under existing workspace
Hello everyone, I currently have a blueprint that holds a bunch of templates. These templates get created under existing workspaces, meaning, i do not want a new workspace to get created. Currently, we're using the manual approach. when a request for these templates come in, we go into control center, and we manually…
-
Move Control Center profile data to Sheet Summary fields
Having to list the profile data in the template is messy and distracting, and frankly looks pretty janky. You already have Sheet Summary fields tucked away on the side panel, able to run formulas, collect metrics, and link in data from intake. This would obviously require the ability to cell link out from Sheet Summary to…
-
Multi-Tier Control Center
I have been using the Legacy Smartsheet Control Center(SCC) for a few years. I now have a use-case where a Multi-Tiered Blueprint would be beneficial. Can anyone point me to some 'more than a general overview' training links to where I can get up to speed on the setup of a multi-tiered program/blueprint solution? Thank you!