How to create multiple Tasks based on multiple "Assigned to" from a Project Plan

In a project plan there can be multiple owner to complete the particular task. How can the same Task which requires multiple stakeholders to be extracted in to "Another Sheet" with unique record for each owner to complete that specific action?

For Example: From screen shot task#29 have multiple owners under "Assigned To" field in a project plan. How can I copy this task to "another sheet" in seperate lines with each owner. As per Assigned To value four task should be for each owner to work on a task. Owner number can differ based on task, it should autmatically calculate the values & create task basis on "Assigned To" values only.