How do i exclude Weekends from a Gantt Chart

Options
Brendon
Brendon
edited 03/21/23 in Formulas and Functions

I have separate gantt charts to program our install and production, the production is driven by the install sheet, the end date on the production is set by a vlookup to the install schedule start date then less 2 days so that product is completed 2 days prior the install day. the start date is simply less number of days production required. at the moment install starting on a Tuesday needs shows as needing to be fabricated on Saturday. Is there a way i can can the production sheet to exclude weekends?

Information to the install smartsheet is loaded using a Smartform , production is also loaded using a smartform how ever only the job number is loaded and number of production days, rest is self populated using the vlookup to the install sheet.

Best Answer

Answers

Help Article Resources

Want to practice working with formulas directly in Smartsheet?

Check out the Formula Handbook template!