Auto direct risk from master register to project risk

Ide AirTrunk
Ide AirTrunk ✭✭✭✭✭✭
edited 02/17/25 in Add Ons and Integrations

I have a master risk register with a column controlled by Bridge to update when a new project is spun up in Control Centre.. that way it's easier for people to add risks for a project.

Is there a way to automatically divert the risk from the master register to the respective project register?

I have the project code as metadata..

I was thinking something along the lines of the picture below, but a little stuck on the actual solution!

Really appreciate any help.