I have a risk sheet with a system generated id column (ACT-0001); etc. In the risk sheet I have a helper column to identify if the risk is linked to a task in my project plan sheet.
In my project plan sheet, I have a column called RiskID that contains a string of risks (ACT-001; ACT-0002; etc.) linked to a task. The risks are separated by semi-colon, how can I inform the risk sheet that the risk row is linked to a task in the project plan.
I tried countif with wildcards, find, etc. to no avail.