I have an SCC blueprint with two summary sheets. We have several metadata fields, two of which are set up as cell links in the blueprint, the job number and job name.
That way, if the job number or name is updated on the intake sheet, it automatically updates on the project metadata sheet, which updates the summary sheets.
While we have no issues with cell links on the first summary sheet, 90 percent of the projects are set up with no cell links on the second summary sheet. I can manually go into the projects in control center and click "update reporting," and that adds the cell links, but that shouldn't be a necessary step.
Has anyone else had this issue? If so, do you know of a way to resolve it?