Sign in to join the conversation:
I have created core worksheets, from these (which have the links) I have created templates.
How do I make sure the links follow the path?
Meaning when I save the Template as 1231 Test from 1231 Template.
???? GRRRRRRR
Hi,
Can you explain more in detail because I'm not sure what you mean?
Best,
Andrée Starå - Workflow Consultant @ Get Done Consulting
So I have created a worksheet. I took that and created a template. When you open the template, (you have to save as a new), so I tried just saving it as the same name and dropping it into a new folder. When I do that, the links are broken, It will update the "template" sheet not the new one I created.
Hope that helps
I'm not entirely sure what you mean still, but I think that you want to have links (cell-links?) intact when you create a new sheet from the template or sheet? Correct?
When you open a template, you should get a preview of it and then chose "Use Template" and then chose a name and some options.
When you have a sheet (sounds to me that is what you're using) and chose "Save as New" you also get options for name, data and formatting options (make sure that you chose the right options)
If you want to edit a template, you must use the original sheet and then create a new template or create a new sheet from the template and save that as a new template.
Andrée
I created 2 sheets. One sheet has links to the other. Now when I choose to save them as new to drop in a new folder, the links do not stay, I have to recreate the links once I open them in the other folder. Make sense?
Ok.
Are they placed in a folder already? If yes, you should "Save as new" from the folder and that will keep the links intact. If no, place them in a folder.
Understood, they are in a folder and when I go to "save as new" I put in a different folder and I lose the links still. Getting frustrating as I need to be able to do this since the original 2 are the templates to use and save as new with another client name.
Is everything in a workspace?
Is it sheets or templates?
Can you share them with me?
yes in a workspace
sheets
how do I share with you? I assume just add you on the share?
shared!
When I use the zoom-in option, I can only see the day names but not the specific day numbers. I need my team to be able to see the exact dates for the tasks I have scheduled.
I'm trying to create a graph chart that captures monthly count of records by divisions (Northeast, West and Central) that should be stacked with a legend displaying each by different color like a presented in Excel. When I attempt to duplicate the process in Smartsheet I receive the following results. In Excel, I created…
Hi, I'm using smartsheet to track updates on each task in a tracker. These updates may span over a year, so they get lengthy. I was excited about smartsheets because viewing these notes is a lot cleaner. However, I've just realized that there is a content limit to a cell, which is a huge issue. While excel was annoying to…