For some tasks, the parent shows a percentage (e.g. 5%), others just a number (e.g. 0.9) (see attached). If I add new rows, the % shows, but I see no method to change the format of the non-% ones. Any ideas please.
Did you apply formatting to the entire column?
That can't be done as the column is locked by Project Settings due to activating dependency settings.
Damn, I rechecked and now the % format option is accessible. I clicked and problem solved.. Thanks for the pointer back to that.
I would check and make sure your dependencies are turned on as you indicated they were. I'm glad we got that problem solved!
Can someone tell me how to get rid of the 120.0% max on this graph? It is always going total 100% and never any more, so I would like to use more of the space for graph display purposes. I even tried reducing it so that the largest value was 99.999%, thinking maybe being exactly 100 would cause the next "level" to…
I have 2 sheets that I need to link: Sheet 1 - collects user registration information through a form. Sheet 2 - I want to link some columns to copy partial data collected in sheet 1 and have it show in sheet 2. I don't want to copy the entire row, just select columns and I don't have Smartsheet Bridge. Each sheet has a…
Currently, I have a report connected to a single sheet. This sheet contains various formulas, including cross-sheet references. When data is added to the report, the formulas will not update/work unless the sheet is refreshed. Is there any way to have the formulas values "pop-up", or otherwise load? It is somewhat…