Anyone who wants to share experiences switching from using Jira to Smartsheet?
So, nothing about integration etc. but when you have move from working in Jira to doing this in Smartsheet.
Hi @JoeMP
If none of our members in the Community have suggestions, you may want to reach out to our Sales team (here) to discuss best practices and tips/tricks for moving from Jira to Smartsheet.
Cheers,
Genevieve
Hello! I have created a collision calendar within Smartsheet Calendar and have it posted in a dashboard format on Smartsheet. I would like to add it as an app integration into a Microsoft TEAMS site. So, when a member of the TEAMS site goes to it they can easily click at the top beside "shared" or "files" and have a…
Hi, we use control center to roll out project toolkits, the intake sheet includes a start and end date for contracts. These dates pull through to a metadata sheet then to various other assets in the toolkit. To set up I right click the cell and select 'Link from cell in other sheet' and link to the relevant cell in the…
I have a column with a dropdown list. The column is restricted to listed values, and you can select more than one. There is no logic assigned to that column in the dynamic view, and is not listed as required. I've tried disabling the conditional logic on the sheet, and it did not correct the issue. This is happening to…