How to print date range for calendar view of reportIn Using SmartsheetWhen I print a calendar view of a report I am given the option to select a date range, but even when I select the date range, a four week period prints. Here I select just three days. But the PDF shows four weeks. Is there a way to only pr…
-
Printing a dashboard and one of the widgets is unalignedIn Using SmartsheetIn the online version, everything is perfect, when I print it to PDF, the milestone chevron lanes don't line up with the "assigned to"/"health"/"status" columns. How can I fix this?
-
Printing across multiple pages - Gannt chartIn Using SmartsheetWhen printing across two pages, can I repeat the columns with task, duration, start and end date, etc on each page.Answered - Pending Review 33 views 2 comments 0 points Most recent by Simon Cusack (CCHD) Using Smartsheet
-
Print out WorkflowIn Using SmartsheetIs there a way to print out the workflow so it can be shared in a presentation or discussion with the team? I seen someone asked last year but there has been no update to that question.
-
Volunteer AllocationIn Formulas and FunctionsHi All, I am attempting to find a solution for a specific manual task that is error prone and very time intensive - We need about 300 volunteers occasionally on short notice and need them across multiple cities in 20-50 specific location…
-
Printing Rows - Missing line breaksIn Using SmartsheetHi, my name is Joe. When printing a row, the line breaks are being ignored. When viewing a row by double clicking on the row number, the line breaks are processed correctly. See attached images. These line breaks are formatting that is car…
-
Formatting when exporting to pdfIn Using SmartsheetHi, Is it possible to create a pdf report based on one form entry? I know I can send an email confirming what has been entered on a form, however I would like to make this a pdf attachment rather than the body of the email. Lauren
-
Date Range PrintingIn Using SmartsheetHi, I am having trouble printing a specific date range in gantt view. I've selected the dates, tried printing, but it shows the full spread and never reduces to the specified date range. HELP! Thanks, Simon
-
Smartsheet to Word DocumentIn Using SmartsheetOne of the ways, we utilize Smartsheet it is track the publications that come out of research. A few times a year, we are required to report on all publications and they need to be formatted in a specific way. Is there an option to transfo…
-
Time Formats - Number formats - Rethinking the UX and functionIn Formulas and FunctionsHaving an entire dialog for text and number formats would make much more sense to me.. combine the currency, percentage, thousands and decimal places into it's own dialog box. We really NEED a way to save and modify the formatting of comm…