Datamesh Source Missing
I set up a datamesh workflow and then when trying to run, datamesh couldn't locate the source report. I have confirmed I am an admin on the source and the target. Is this is a support issue or a me issue?
-
Creating lookups through control center
Hello, I believe there is a way to do what I am asking but I am just unsure how to accomplish this task. Currently in control center we have a "revenue template" and some of the data that needs to be in this sheet has to be exported from Power BI and currently we are coping and pasting the data into the revenue template…
-
Change the source sheet on Data Mesh
I've just started with Data Mesh and my only problem is not being able to change the source sheet. There is often new informational sheets I need to update and instead of having to make a new Data Mesh and delete the old one, it would be nice to be able to change the source sheet to reflex our changes. Thanks
-
Feature Request: Critical Need to Allow Changing the Source Sheet in Data Mesh Configurations
Hi Smartsheet Team and Community, I would like to raise an urgent enhancement request regarding Data Mesh source sheet configuration. This limitation is causing significant operational issues for teams relying on automated updates through APIs and database integrations. 📌 The Problem When the source sheet connected to a…
-
DataMesh configuration does not run every hour
I have my DataMesh information scheduled to run every hour, but the reporting says something different. Is this common?
-
Enable sheet summary reports to be used in Data Mesh
Currently, reports generated using Sheet Summaries return an error message when attempting to use them in a data mesh configuration.
-
Allow Adding Multiple Source Sheets in Data Mesh
Hi Team Recently in the new update we are able to add up to 5 destination sheets in the data mesh which has become very useful. In the same way will it be possible to allow adding multiple source sheets also in one mesh. This will be very helpful in reducing the number of meshes for a particular task
-
Cell Links Between Sheets Don't Work Consistently
Hi - I have set data mesh cell links between multiple SmartSheets that I own. The properties of the columns on the different sheets match. In the Data Mesh set up, I've selected: To overwrite content To create cell links To run immediately I have multiple instances where data changes on the source sheet and does not update…
-
Use a Report as a Target for DataMesh.
It would be helpful to use a report as a target sheet for DataMesh so you could easily update data across multiple sheets.
-
Datamesh can pull from a formula column?
In my source report being used for a datamesh I have a column that is a formula column with a nested IF statement. The destination sheet is set-up to be a text/number field. Other columns work on the same source report are meshing, the one that is a column formula is not…is that the issue here? Thank you