Change the source sheet on Data Mesh
I've just started with Data Mesh and my only problem is not being able to change the source sheet. There is often new informational sheets I need to update and instead of having to make a new Data Mesh and delete the old one, it would be nice to be able to change the source sheet to reflex our changes. Thanks
-
DataMesh configuration does not run every hour
I have my DataMesh information scheduled to run every hour, but the reporting says something different. Is this common?
-
Enable sheet summary reports to be used in Data Mesh
Currently, reports generated using Sheet Summaries return an error message when attempting to use them in a data mesh configuration.
-
Allow Adding Multiple Source Sheets in Data Mesh
Hi Team Recently in the new update we are able to add up to 5 destination sheets in the data mesh which has become very useful. In the same way will it be possible to allow adding multiple source sheets also in one mesh. This will be very helpful in reducing the number of meshes for a particular task
-
Cell Links Between Sheets Don't Work Consistently
Hi - I have set data mesh cell links between multiple SmartSheets that I own. The properties of the columns on the different sheets match. In the Data Mesh set up, I've selected: To overwrite content To create cell links To run immediately I have multiple instances where data changes on the source sheet and does not update…
-
Please Allow Multiple Admins for DataMesh
Our team is really struggling to troubleshoot issue when the owner of a DataMesh or Data Shuttle is out of the office. Please allow multiple Admins and/or Editors (or, at the very least, Viewers) for these critical tools.
-
Use a Report as a Target for DataMesh.
It would be helpful to use a report as a target sheet for DataMesh so you could easily update data across multiple sheets.
-
Datamesh can pull from a formula column?
In my source report being used for a datamesh I have a column that is a formula column with a nested IF statement. The destination sheet is set-up to be a text/number field. Other columns work on the same source report are meshing, the one that is a column formula is not…is that the issue here? Thank you
-
Using DataMesh to Split One Line Onto Multiple Lines (for Forms Entries and Other Uses)
This is a problem I've heard a few times so I'm answering it in a separate post for reference in long form. I'm using the example from @WtaylorW's question over here. The basic need is to take one line and split it onto multiple lines. In this example you have a form that's inputting multiple names in different columns,…
-
Integrate DataMesh with Control Center
I have a lot of use cases where it would be so helpful if I could provision DataMesh workflows when projects are provisioned through control center. There is no way to copy a data mesh workflow, so if I need one created for a project, I have to recreate the entire workflow, every time.