Hi -
I have set data mesh cell links between multiple SmartSheets that I own. The properties of the columns on the different sheets match.
In the Data Mesh set up, I've selected:
- To overwrite content
- To create cell links
- To run immediately
I have multiple instances where data changes on the source sheet and does not update in the linked cell on the target sheet.
This is extremely frustrating. Usually, if I go to the data mesh I set up and click the 'run' button, I can get it to work, but then eventually it again just stops working.
Do I need to change something in how I've set this up?
Thanks in advance for any guidance. There is quite a bit riding on this, so there are major risks to this not performing as expected.