Removing the "Comments" tab from exported Excel reports
Hello, everyone! I have an automated Report that exports as an Excel file attachment to a team leader every week. He uses this report to upload info into a different system (not project management, a totally different thing). Each report comes with the report on one worksheet tab and a second worksheet tab called…
-
Export to PDF Selected Rows
Hey all, Hoping this is an easy fix. I can't seem to print/export selected rows, only the entire sheet. I'm trying to document employees scorecards in one sheet for supervisors then have them export the individual employees row to review with them on a monthly basis but it won't let me do the selected rows button. Any…
-
Exporting to excel
Hi I have a sheet that has a date column that is set to MM/DD/YYYY but when I export the sheet to excel the date field is coming over as MM/DD/YY. Is that suppose to happen? Am I doing something wrong? Thanks Carol-Anne
-
Exporting group members
I'm wanting to do a review to make sure I have everyone placed in the right buckets. I can dump a user list but there's no group membership details included. I don't see any automated way of dumping group members to CSV for review. The best solution i found is stupid -- open each group and copy-paste the html into excel…
-
Export to PDF
Hello, Is export selected rows to PDF disabled? thanks
-
PDF Export Improvement
When I export a Gantt chart to PDF (Entire sheet, all dates, letter, default margins, landscape orientation, fit to width), the task bar labels get cut off on the right side. I tried changing the scaling options, but the task labels toward the end of the project always get cut off. The same thing happens when I export to…
-
Using data shuttle for weekly backups from smartsheet to sharepoint
I have successfully turned on the weekly export from smartsheet to sharepoint, but the action is "replace". I don't want to replace my file each week, I want a series of dated weekly backups for an audit trail. Is this possible?
-
Any recommendations for conversation export with a project to Excel
Hello, I am exporting a project that has a WBS column and would like to include the conversation. This currently exports to a separate tab in Excel but there is a disconnect between the reference conversation line item and the first tab where the row information exports. It typically shows one row off from the actual…
-
Some dates importing incorrectly through Data Shuttle
I am uploading data onto Smartsheet through Data Shuttle from a CSV file. I have a date column and have confirmed most dates are importing correctly, however there are instances where the day and month are swapped. i.e. the date on the CSV file reads 12/04/24 (DD/MM/YY), but is added to the Smartsheet as 04/12/24. I've…
-
Image as map input
Hello, Is it possible to use an image as a map to either click to input coordinates as x and y values or to plot the coordinates back onto the image? I've done lots of searching but can't find anything. I want this feature to mark locations on a site plan or equipment drawing. Not a Google map. AppSheet does something…