-
Transform time in minutes
Our Smartsheet has been build with time entered that way 2h00 0h15 0h15 1h00 3h00 2h00 1h00 0h15 0h15 3h00 0h30 18h00 I want to transform that value automatically in minutes (120 / 15 / 15 / 60 / 180 / 120 etc) Any idea on how to do it in smartsheet? thanks
-
Completed Row Drops To Bottom
Hi everyone, While at Engage18, I heard there would be a way to have a row drop to the bottom of the sheet, once completed. Does anyone know if it's at all possible right now, or is this something they are still working on?
-
MAXIFs Alternative?
I have a google form that updates the prices of materials. On google sheets to display the most updated price of the material I have a Newest Entry Column =MAXIFS(Timestamp:range, Material cell) then in the material price columns I have an Index/Match formula to display the most recent entry for that material. I would like…
-
Date Calculation
I have 3 columns. 1 column is the date that the time begins, the 2nd is a factor that is either 1.5, 3 or 5. It is always one of these three numbers. The 3rd column is for the end date that is auto-calculated by taking the date in column 1 and multiplying it be the factor selected in column 2. How do I do that? I am really…
-
Move Project with Predecessors
I need help moving a project that has predecessors. This is being used for a production facility to track the status of our projects. However, I have run into a problem when needing to move a project in the order of production. The predecessors are not moving with the project change. -I need the "Design" process of the…
-
Smartsheet connection with Alteryx workflow
Hi, Someone facing an issue to connect data from Smartsheet into workflow in Alteryx? I have an Alteryx with data connected from Smartsheet that always worked well, but last friday the alteryx wont able to connect with Smartsheet, the message in Alteryx is "No valid Fileds were selected. This connection between Alteryx and…
-
Message Placeholders
Hi everyone, Does anyone know of issues with setting up "Message Placeholders"?? I followed the steps, refreshed, logged out, then back in but nothing happens. Not sure what Im doing wrong. Ive attached a screenshot.
-
TODAY() Function is Replacing Previous Date
Hello, I have a column in a production spreadsheet that I am utilizing to enter the date of which one of our production members completes an order. The columns are set up as follows - one column is an initials column where a production member selects their initials once they complete an order. The second column contains…
-
Building sheets that talk to each other
Hello, I have two sheets I would like to reference data to and from and I understand how to us the =VLookup option BUT what I cant seem to get it to work. I basically want one sheet that our shipping team updates to automatically update another sheet my purchasing team uses. The columns have dates and check boxes so when…
-
What happens when you approach Maximum Rows in Smartsheet?
I know there are many advantages to having many small sheets in Smartsheet rather than one large sheet. However, in some cases, it seems easier to manage to track many small, similar projects on the same sheet. Has anyone had experience with sheets that have a number of rows near or over the Smartsheet maximum of 5,000…