This is my second time giving Smartsheet a chance and it's going to take a lot for someone to convince me this platform is any good whatsoever.
The Problem:
I created a Portfolio from their template, and all fine as I was working through etc., except for the project plan template. For some reason, when I get to a certain row using the very in-built template from Smartsheet that they created, the formulas break due to a data-type error, even though it's all the same data-type (a date). See screenshot. What I have tried:
- Reformatting column
- Making sure dates are correct / data type is correct.
- Checked the built-in formula to see if any errors (there isn't, it's identical for the column).
- Deleted my copy/pasted data, adding new rows manually, manually entering dates etc.
- I am the owner and Admin of this Portfolio, however, I do not have the ability to change or update formulas in the sheet(!?)
I've tried it all. It's draining how poor this platform is. I am close to throwing my laptop at a wall and it's only 10am.
It's almost like everything that would appear to be common-sense was forgotten when they built this platform.
Somebody please tell me how to fix this because our Enterprise Acc Manager at SS is also useless and doesn't respond.