I have a column with a long URL http://blblblblbl... There are about 300 rows in the sheet. I'd like to change the display text of the links to Preview for all of them.
Is there a way? I can not do this one by one. (multiple sheets with the same set up).
Thanks
Hi,
There currently isn't a way to change all of these URLs to include display text across all of your sheets all at once in a batch update.
You might consider updating one cell with the display text and URL, then drag filling down or using copy and paste (ctrl + c and ctrl + v) to make the change on a sheet by sheet basis. More info on these methods can be found in the help center: https://help.smartsheet.com/articles/518318-using-copy-paste
Staubm,
I think I know your problem, and have a way to fix it. If I understand correctly, you want to display the friendly text for the url "GoHere" instead of the full hyperlink "https://123.mrsupercalifragilisticexpialidocious.com/home/GoHere"
Here are the steps: (takes about 5min per sheet)
1. Export your Smartsheet to Excel and format all of your hyperlinks the way you like them. Save it as .xls
2. Do a Save-As on this Excel sheet and save it as file type .html
3. Open the .html file in a web browser and do a Ctrl+A to select all, then Ctrl+C to copy.
4. Open a brand new .xls file and paste into the new .xls file. Save
5. Import your excel file into Smartsheet and then copy/paste your column from the imported sheet into your original sheet. Voila!
Don't ask me how I figured that one out. It was frustration and luck
How do I see who submitted a form for a specific sheet?
Hi, I have a Gantt covering 500+ rows of events past and planned. I use it to predict and track values around these events. Using helper columns to identify the current week, I get an email report on a Monday that tells me the upcoming events in the current week (7 days) and their values. Currently if an event spans…
Hi Smartsheet Community, I'm working on an action management system where users create sub-actions through a Smartsheet Form. The requirement is simple: a sub-action's due date must be earlier than or equal to its parent action's due date. For example, if the parent action is due on June 30, 2027, users should not be able…