Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
Hey,
What is the smartsheet furmula for multiplying
so far i tried
=Skupaj ure za tekoči mesec1 * Urna postavka1
=[Skupaj ure za tekoči mesec]1*[Urna postavka]1
i am trying to multiply monthly hours and hourly rate.....
no problem using excel.......
Hi n0m4d,
Assuming the column name references are correct, then your second formula should work fine:
=[Skupaj ure za tekoči mesec]1 * [Urna postavka]1
They are both numbers obviously? You're not trying to multiply "Green" x 12/01/18 or anything right?
Kind regards,
Chris McKay
values were ok, but figured out just now, while I had copied it from excel there had to be some kind of error, deleted the whole column and rewrote values, now it is working.
Good stuff buddy. Glad it worked out. I know how frustrating it can be when these sorts of things seem right, but just aren't.
Though Chris fixed it for you he failed to mention that column names with spaces or that end in numerals must be placed in brackets. That is why you weren't getting the results you were looking for.
Thanks Mike,
As the second example formula provided by n0m4d was correctly contained in brackets, I considered it a moot point so left it out. But in hindsight, it's a relevant tip to include.
I'm not going to take any credit for fixing this one either as n0m4d did all the troubleshooting.
Totally missed his second one... haha. Sorry to intrude!
No intruding at all good buddy. We all miss things and it's nice that the community is robust enough that there are loads of people willing to help .
Hi All, I'm working on a formula that is evaluating three columns of data: 1) EOY Target Weighted MWh 2) Forecast Weighted MWh 3) Increase/Decrease (to determine if the goal for the year is to increase or decrease the MWh) Here is my current formula: =IF([Forecast Weighted MWh]@row = [EOY Target Weighted MWh]@row, "On…
I need the Date of Sample Shipment to start within 20 days of the Date of Manufacturing Start Date. However, the predecessor I have there isn't working properly. What should it be? Thank you so much
I am trying to find a way to look at text fields and automatically remove date and time stamps plus employee names. Any recommendations on identifying and removing text strings that meet the below formats: YYYY-MM-DD HH:MM:SS.SSSSSSS ####### [Employee Name] YYYY-MM-DD HH:MM:SS.SSSSSSS ####### [Employee Name] We have a…