Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
I would like the column "Done" to be checked automatically if the % Complete is changed to 100%. I am using the formula below which is not working:
=IF([% Complete]3 = "100%", 1)
Any suggestions?
If your % Complete column is formatted to be a percentage, you will need to replace "100%" with 1 (no quotes).
=IF([% Complete]@row= 1, 1)
thank you so much!!! it worked
Happy to help!
Smartsheet stores percentages as a fraction of 1, so
100% = 1
75% = 0.75
50% = 0.5
25% = 0.25
0% = 0
and everything in between.
Hi all, reaching out to see if of you have ideas; I'm hoping this makes sense: I'm having some trouble getting my formulas to pull data in correctly. I currently have a sheet (primary data) where I have data in rows where each row is a single project, with columns identifying persons, $ values, unique project identifier,…
Hello, I have a workflow where, when a team member checks a checkbox, Smartsheet automatically sends an email to themselves containing merge fields that are used as a customer email draft. The challenge is that this activity typically happens on a deadline day, and a team member may need to generate 30 or more of these…
I have a sheet with 5000 rows and 30 columns. with 4 columns of them are formular columns. How can i reach this limit for 25000000 formular cells reference? How can i enlarge this limit? I need those formular to link some data from another sheet as there is also Max cells limit for one sheet. How can I join those data…