Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
Hey
Is there a way to temporarily disable a Bridge workflow? I need to perform a mass upload in my sheet and I need the Bridge routines turned off temporarily.
Kelly
@Kelly Moore What if you were to temporarily disconnect the integrations? Do you think that'd work?
Hey Ayelet
Yes, I thought about that - I wasn't sure if I did it that the workflows would remain unaffected. In the end, I'm taking out the runtime event that is associated with the Get Row in every routine. It will throw an error but not run. It's a pain- more than 25 flows are affected across 3 sheets. Submit your enhancements for the toggle button on workflows AND also on Workspaces. It would have been great to turn off my 3 workspaces and be done with it.
Thanks for the response.
Another good enhancement, along this same line, would be basic "enable", "disable", "start", "stop", and "log" buttons available at the All Workflows screen next to each workflow would be wonderful. Along with an indicator of what was currently running, and the trigger conditions.
Oh and rename. My kingdom for rename.
:-)
Hello all you SmartSheet masters….I use a form to create a master file of my players…at the bottom they can attach a picture to be used by my software later…. My issue is how to I send a player a link that will allow them to update the current picture under some password protection…… Can you thing of a way that they can…
Hi All, I am trying to connect to a csv via datashuttle in my work provided Onedrive. I am able to log on and drill down to the file but when I hit Select, nothing happens. Interestingly, the Cancel button does not work either. All other buttons work. I have spoken to IT and everyone else has the same issue so am guessing…
I have a dynamic view set up for partners to enter sales reports each month. They sometimes need to go back and edit their entries, and they do so through the DV. The issue is that when a partner makes an edit in Dynamic View, it messes up the format of the number in the parent sheet. When I click on one of these edited…