Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
In my sheet I would like the 'Status Level' column to autochange to 'Complete' when the checkbox for completed is checked off. Is there a formula to so this with?
While there potentially is a way to set this do what you are asking, the challenge will come with if you or someone else changes the dropdown status. It would be easier to have the checkbox for complete auto check when the dropdown says complete. If you populate a dropdown field with a formula, then manually choose a dropdown option, it will overwrite the formula and would stop working. I would stick with marking items as complete via the dropdown or come up with a method for checkboxing the other status' so that no one is manually setting any of the dropdown statuses. Does that make sense?
While this post does not speak directly to your request, the concept and solution are the same.
http://ronin-global.com/2016/12/11/smartsheet-fixed-date-upon-completion/
Craig
So using Zapier, a paid third-party application, you can complete your request.
Hi all, reaching out to see if of you have ideas; I'm hoping this makes sense: I'm having some trouble getting my formulas to pull data in correctly. I currently have a sheet (primary data) where I have data in rows where each row is a single project, with columns identifying persons, $ values, unique project identifier,…
Hello, I have a workflow where, when a team member checks a checkbox, Smartsheet automatically sends an email to themselves containing merge fields that are used as a customer email draft. The challenge is that this activity typically happens on a deadline day, and a team member may need to generate 30 or more of these…
I have a sheet with 5000 rows and 30 columns. with 4 columns of them are formular columns. How can i reach this limit for 25000000 formular cells reference? How can i enlarge this limit? I need those formular to link some data from another sheet as there is also Max cells limit for one sheet. How can I join those data…