I have set up our Control Center to provision initiatives. We assign a unique ID to each initiative that is used for time tracking in our PSA system. However, about 5% of our initiatives need to have more detailed time tracking codes but the time will roll up into the overall initiative. Here's an example (where the unique ID is in parentheses):
- Initiative A (0123)
- Initiative B (0456)
- Initiative C (0789)
- Time Tracking Code 1 for Initiative C (0789)
- Time Tracking Code 2 for Initiative C (0789)
- Time Tracking Code 3 for Initiative C (0789)
All of my initiatives (A, B, and C) are added to the Portfolio list via provisioning the projects in Control Center. My thought is to just manually add the time tracking codes as subitems under the initiatives on the Portfolio list so we know how everything is mapped. We could also bring time tracking data in at the detailed level and have it sum up to the Initiative.
However, I don't want to break anything with Control Center or potential updates that come through for those initiative rows where I may manually add the unique time tracking codes.
If I add subitems under projects in my Portfolio list, will it impact anything done via Control Center? Will global updates still work on these rows? Will updates to data still work correctly?
I'm guessing it'll all be OK but wanted to see if anyone had any experience or advice with this. Thanks!