I need to create a high level project on a detailed project that contains a number of indented rows

JacqGrea
JacqGrea
edited 02/07/25 in Smartsheet Basics

I have tried to create the high level project sheet using linked cells and the index function however it keeps failing to transfer the information across. I need the sheets linked so that when information is added to the detailed sheet it will update the high level sheet

Answers