Idea / Feature Request
I’d like the ability to adjust or reset the baseline for a single task (or selected tasks) instead of having the baseline feature work only at the entire-sheet level.
Right now, “Set Baseline” and “Reset Baseline” apply to the whole sheet. On certain projects, especially in construction, only certain activities are formally re-baselined (e.g., when the GC or owner issues a revised start date for a specific scope), while the rest of the plan should stay tied to the original baseline.
This would allow me to better match real-world project control practices where only portions of the schedule are formally re-baselined, and reduce the need for manual baseline workarounds (extra columns, copy/paste values).