With an AS9100 Audit coming up for us, many have asked if our Smartsheet templates need to be revision controlled. Does anyone have any insight on this they could share?
Hi Laura,
From my understanding AS9100 is based on the ISO 9001 QAP, which heavily relies on document revision control: https://www.quality-assurance-solutions.com/document-revision-control.html
Thanks Shaine. I understand the AS9100 standard, but wasnt sure if anyone else had feedback on how they control their smartsheet templates. I've decided to export all templates to our server for backup, just in case the smartsheet location somehow isnt compliant.
I have a workspace that I created with two subfolders. A user needs to have access to only one of them but when I have that folder selected, I can only share the entire workspace with them. Is there a secret way that I can share the parent folder and ensure that any new files created will be shared with the same people? I…
I have a Pro plan but I cannot create ANY reports. The system does not allow me to choose a folder, and consequently a sheet to create a row report and suggests an upgrade to Business or Enterprise. I'm quite new to Smartsheet and feel a bit disappointed with this limitation, or maybe I'm just doing something wrong. Alberto
I have multiple items that each have their own statuses and that roll up to "workstreams" or swimlanes. On the dashboard, I would like to show the progress of the items by swimlane without breaking it out into separate widgets for each. This would ideally be a stacked bar where each bar represented the Items and was broken…