I'm cell liking in a Grid sheet, and it looks like I've reached the max of cells I can link 500, is there a way to work around there, is there anything to link more then 500 cells on a grid sheet!
Hi Kimble,
It's just the limit per session.
I hope this helps you!
Best,
Andrée Starå - Workflow Consultant @ Get Done
Andrée,
]
Thank you, that helps!
Kimble S
Happy to help!
Incoming X-Sheet References (another way to get a cell link) has a higher limit.
https://help.smartsheet.com/articles/2476606-formulas-reference-data-from-other-sheets
Craig
Helloe Everyone! I’m trying to reference another sheet in Smartsheet, but I’ve noticed that sometimes it loads quickly, while other times it takes a very long time to display the list. Does anyone know why this happens? Is there a way to reduce how often this issue occurs? Today, I can’t get anything to load at all. 😑
Hello - Is there a work around in a Report to list multiple sheets in an order that I choose? Sorting doesn't give me the order in which I want them to appear in the report or in a widget on a dashboard. I would like them in a specific order. Thank you.
I need to revise/expand a filter - the list of items in the filter NOT the filter name - in a dashboard I created. Is this done through the dashboard or through the main data sheet?