Using colum % complete

Using colum % complete

Hi,

I would like to know how I can assign the porcentage in the % complete column. If my stage has a duration of 20 days and I want to assign for each day%.

José Ibanez, ing. Jr

Ingénieur Manufacturier

Manufacturing Engineer

Answers

Sign In or Register to comment.