I need to be able to assign different work periods to different line item tasks. We have some subs that work 8hr 5 day weeks and others that we accelerate for some work to do double shifts or 6 days a week. We also at times will add saturday to a sub for a period of time and then switch back to 5 day. Currently if I change the length of the work week it is global which is not accurate and would force me to go in and change each activity. The duration is not changing just the days that are worked.