Losing Data & Slow Performance
Hi, just recently my Smartsheet is going really slow, and I'm losing information I've just entered. I can't drag information from one cell to another, and can take 3 seconds or longer to load information, and half the time the file doesn't actually attach. I have to close down and reopen Smartsheet all the time so it saves…
-
Show only own tasks in calendar
Hi, I am new to Smartsheet. I already searched for this topic, but wasn't successful. By standard, the calendar in Smartsheet shows all tasks of everybody. I imported the calender into my Google calendar (via ics and directly). There also all tasks of everybody are shown. Is there a way to show only your own tasks (you are…
-
Publishing only filtered list to google calendar
I'm having an issues with "Publish to Googgle Calendar". Every time I've publish some task in google from SamrtSheet, SmartSheet publishes everything in my Google calendar instead of publishing the specific tasks assigned to me. I've attached a detailed description of the issue I'm facing with screenshots. Does anyone know…
-
Limiting tasks (by name) to specific days of the week
Hi, I'm looking for a way to control specific tasks being allowed to start on only certain days of the week. For instance, a task name containing "A" is not allowed to occur on Mon or Fri, only possible to start/finish on Tue, Wed, or Thu. Keep in mind, A is a precedent for B, which is a precedent for C. But B and C are…
-
Return 1st column value if 2nd and 3rd column is blank
Hello, I am trying to come up with a solution for my smartsheet involving 4 columns (4th being the result column). I wanted to return the value from the 1st column whenever 2nd and 3rd column are blank, if not return the value from either 2nd or 3rd column. These columns contains dates by the way. Sent (1st) ; Won (2nd) ;…
-
Master Sheet with Subprojects Inside
Hi! I am trying to create a Master Project sheet that would include subprojects inside of the same sheet. Basically so I can track the dates and overlapping of tasks in the subprojects. Is this something that Smartsheets can do? I know I can do it in MS Project and just add each subproject as it's own task in a master…
-
Allow a cell to only be certain days of the month
I put together schedules that include public hearing dates that are typically certain days of the month , i.e. 2nd Tuesday, is there a way to assign this to a cell in my schedule? Currently I have to go to that point in my schedule and manually find the date and each time the schedule changes I have to make sure I update…
-
Web Content WIdget 365 Calendar
Please add a connection to the 365 Calendar from the web content Widget. Thanks
-
Calendar View | Start Day
I want to be able to display the calendar view with Monday as the fits day of the week (Mon- Sun) insetad of Sunday (Sun- Sat). Is this possible?
-
Open To Today's Date for Viewer and Editors