-
Customizable view options in Smartsheet Card View
I think it would be useful to be able to customize the Card view in Smartsheet grids and reports to include additional view options, such as by date or other custom columns, instead of being limited to the default options like "status", "schedule health", or only being able to view by columns that are dropdowns or symbols.…
-
Merged: Custom Card View
This discussion has been merged.
-
Is there a way to turn off automatically applying the last filter used when reloading a Smartsheet?
I have a program set up to link to a smartsheet row (in card view); however, it is automatically applying a filter upon following the link - the filter that is applies changes based on the last filter the user utilized. Is it possible to set it to default to no filter applied upon log-in / refresh?
-
Default View for Reports
Hi There Is there a way to set a default for a Report to Card View? I know you can do it for Project Sheets.
-
Allow for Permanent Default Filtering to No Filter
Create an option for a sheet to permanently have the filter set to default, rather than defaulting to the last filter that a user accessed the sheet on (especially for card view), as it can make links from other applications / email impossible to utilize.
-
Board view sorting?
Does anyone know if this will be a thing. We use card view every day to run a project I manage. Card view has no auto sorting ability and i want to have the cards sorted by a priority rating. as of now Board view has no sorting ability either.
-
Card View "Levels" Options
Currently, Card View's Levels display options allow us to show Level 1/2/3 and below, which is really helpful. It would be fantastic to also have an option to display Level 1/2/3 and above, or Level 1/2/3 only. This addition would make it much easier for us to quickly provide a high-level overview of any given portfolio,…
-
Include a description in each state for a Board View
Hello. One of the reasons why applying the Kanban Framework requires less team management time is because it establishes explicit policies on how to work and, above all, what a task must accomplish in order to change status. For this reason, it would be necessary to have a space where to write a description in each state…
-
Introduce the concept of subcolumns in card/board view "Doing / Done"
Hello. In order to make a proper management following the Kanban Framework it is necessary to distinguish, for each state, which jobs are under development and which, in that state, are finished waiting to be moved to the next state. This is the way the Framework helps to change from a push management, where each team…
-
Add support for WIP limits in card/board view (maximum cards allowed per column or lane)
Hi. The Kanban framework needs the limitation of WIP in order to be applied so that teams can achieve amazing results. The WIP limit sets the maximum number of cards a Column or Lane can have. This is how the workflow is managed. There are 2 ways to implement it, the first one is that if the limit has already been reached,…